Project Inputs
Estimate roofing material from roof footprint or total area, then adjust for pitch and waste.
1) Roof area input
Use dimensions for a quick estimate or total area when you already have plan measurements.
2) Pitch guidance
Roof pitch is rise/run. For example, 6/12 means 6 inches of rise for every 12 inches of horizontal run.
Common pitch presets
Pitch factor: 1.118
6/12 is a moderate slope. A 10% to 12% waste buffer is common for many cut-up roof layouts.
3) Material assumptions